随着车辆基地上盖开发呈递增趋势,为了解决上盖开发对盖下引起的建设和运维问题,需对车辆基地总平面布置、消防、交通、管线、减振降噪等各方面进行适应性调整和优化。通过分析车辆基地开发与不开发的差异性,以问题为导向,提出“一个中心、两个原则”的优化策略,即在保证盖下规模和功能的前提下,既为上盖开发创造良好条件,又确保盖下安全与环境,从选址、总平面布置、检修工艺、消防疏散、通风排烟、交通组织等各方面阐述了优化设计思路,包括良好的站段关系,整合集约用地,采用新型检修设备,加强疏散和防排烟等,尽可能消解上盖开发带来的不利影响,从而实现盖上盖下相互协调、互利共赢。
[Key word]
[Abstract]
In order to solve the problems of construction and operation caused by the development of the upper cover, it is necessary to adjust and optimize the general layout of vehicle base, fire fighting, traffic organization, pipelines, vibration and noise reduction. Based on the analysis of the difference between the development and non-development of the vehicle base, this paper puts forward the optimization strategy of“One center, two principles”, which is based on the problem-oriented theory and the premise of ensuring the scale and function of base, not only create good conditions for the development of the upper cover, but also ensure the safety and environment under the cover, this paper expounds the optimized design ideas from the aspects of site selection, general plane layout, maintenance technology, fire evacuation, ventilation and smoke exhaust, traffic organization, etc. , such as adopt new maintenance equipment, strengthen evacuation and smoke prevention and exhaust, to eliminate the adverse effects of the development of the upper cover as much as possible, so as to achieve the coordination, mutual benefit and win-win.
[中图分类号]
[基金项目]
中国铁建股份有限公司科研项目(2020-C50);中铁上海设计院集团有限公司科研项目(JT2022-KY-034)