根据现行的标准规范和政府文件,系统总结研究北京地铁工程建设初步设计地下工程安全风险评估的内容、程序、方法及相关管理要求,重点提出风险等级标准、分级原则和不同施工方法的工程自身风险及环境影响风险评估要点,为深入开展风险评估、提高设计方案的安全性和实施风险分级管理提供参考。
[Key word]
[Abstract]
According to the existing government documents and national standards,the paper systematically summarized and studied risk assessment contents,procedures,methods,and related management requirements for the preliminary design of Beijing subway construction,and emphatically put forward the standards,principles of risk classification,intrinsic risk of engineering projects and the key-points of the special assessment for high environmental impact risks,which will be conducive to carrying out risk assessments in depth,guiding design optimization and strengthening risk management.