为满足针对轨道交通建设工程进度管理的可视化管控需求,提出并实现了一种城市轨道交通建设工程进度可视化管理系统。该系统基于工程进度管控体系的建立,利用数据运算模型的搭建及数据可视化展示技术,结合工程进度周报管理要求,实现了对工程建设形象进度管理的可视化管控。结合信息化管控平台,为地铁建设工程进度管理人员,对整个地铁线网建设进度、各线路建设进度及各车站建设进度的标准化、可视化及一体化管理,提供了操作平台。提高了轨道交通建设工程进度管理的管理水平,降低了进度管控的管理成本。
[Key word]
[Abstract]
In order to meet the demand of visual management and control for rail transit construction project progress management, a visual management system for urban rail transit construction project progress is proposed and implemented.The system is based on the establishment of a project schedule management and control system, using data calculation model construction and data visualization display technology, combined with the project schedule weekly report management requirements, to achieve the visual management and control of the project construction image progress management.Combined with the information management platform, it provides an operation platform for the subway construction project schedule management personnel to standardize, visualize and integrate the construction progress of the entire subway network, the construction progress of each line, and the construction progress of each station.Improve the management level of rail transit construction project schedule management, and reduce the management cost of schedule management and control.
[中图分类号]
[基金项目]